The Arizona Department of Transportation is scheduled to stripe the new pavement on Interstate 10 east of Quartzsite Monday, July 16 through Friday, July 20 between 6 a.m. to 6 p.m.
Motorists are advised to plan ahead and allow extra travel time between Phoenix and Quartzsite due to lane restrictions.
Motorists should expect slow moving traffic on I-10 in both directions between mileposts 52-63, reduced speed limits through the work zone and law enforcement on-site to control traffic and monitor speeds.
ADOT advises drivers to proceed through the work zone with caution, slow down and be alert for construction equipment and personnel.
Parker Live The Parker area, online.

